EasyManua.ls Logo

ABB IRB 120 - Page 11

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DescriptionRevision
Installation chapter - Section Setting the system parameters for a
suspended or tilted robot on page 75 new.
Installation chapter - Section Robot cabling and connection points
on page 85 updated.
Installation chapter - Section Customer connections on the robot on
page 87 art. no. on connection at upper arm updated.
Maintenance chapter - Value for timing belt tension axis 5 updated.
Repair chapter - New chapter.
Calibration chapter - Section Calibrating with manual calibration
method on page 242 updated.
Calibration chapter - Section Synchronization marks and synchroniz-
ation position for axes on page 228 updated.
Reference information chapter - New chapter.
Spare parts chapter - Article numbers and illustrations updated.
This revision includes the following additions and/or changes:B
Installation chapter - Lifting capacity of roundslings updated. See:
Lifting the robot with roundslings on page 63.
Installation chapter - New illustration showing IRB 120 added. See:
Setting the system parameters for a suspended or tilted robot on
page 75.
Repair chapter - Illustrations xx0900001009 and xx0900000782 up-
dated. See: Removing the cable harness on page 120 and Refitting the
cable harness on page 134.
Repair chapter - Illustration xx0900000924 updated. See: Replacing
the upper arm on page 155.
Repair chapter - Motor axis 4 now delivered as part of the upper arm.
The procedures Removal and Refitting are updated accordingly. See:
Replacing the upper arm on page 155.
Repair chapter - Motor axis 4 now delivered as part of the upper arm.
The section is updated accordingly. See: Replacing motor axis 4, with
gearbox on page 210.
Repair chapter - Illustration xx0900001009 updated. See: Replacing
motor axis 5 on page 211.
Calibration chapter updated. See sections: Calibrating with manual
calibration method on page 242 and Synchronization marks and syn-
chronization position for axes on page 228.
Reference information chapter - "Other standards" added. See: Ap-
plicable standards on page 256.
Reference information chapter - Standard toolkit updated. See:
Standard toolkit on page 260.
Spare parts chapter - Motor axis 4 (art. no. 3HAC037282-001) re-
moved. Now part of the upper arm. See Spare parts - Upper arm unit
in Product manual, spare parts - IRB 120.
Circuit diagram - Updated after circuit diagrams now are delivered
as separate files. See: Circuit diagrams on page 265.
This revision includes the following additions and/or changes:C
Repair chapter - Text added on how to position axis 5. See section
Removing the cable harness on page 120.
Repair chapter - Text added on how to position axis 5. See section
Refitting the cable harness on page 134.
Repair chapter - Text added on how to position axis 5. See section
Replacing the upper arm on page 155.
Calibration chapter - Text added about updating the revolution
counters. See section Calibrating with manual calibration method on
page 242.
Continues on next page
Product manual - IRB 120 11
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
Overview of this manual
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals