EasyManua.ls Logo

ABB IRB 120 - Page 196

ABB IRB 120
272 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InformationAction
xx1300001120
Unscrew the attachment screws and plain
washers that secure the axis-2 motor with
gearbox to the swing housing, use caution
and remove the axis-2 motor.
CAUTION
In order not to damage any parts, hold the
two parts in a firm grip when removing the
motor with gearbox.
16
Refitting motor axis 2 with gearbox
Use this procedure to refit motor axis 2 with gearbox.
CAUTION
Use extreme caution performing these procedures. The cable harness will still
be fitted or be partly fitted during the procedures.
InformationAction
Clean Room robots: clean the joints that
have been opened. See Replacing parts on
the robot on page 118
1
Tip
Use Loctite 7063 (Superclean).
Before refitting, make sure that:
all assembly surfaces are clean and
without damages
motor and gearbox are clean and
without damages.
2
xx0900001050
Remove the two screws with nuts securing
motor axis 2 with gearbox while being
transported.
3
Parts:
A: Screws with nuts, used during
transport (2 pcs)
Remove old residues of Loctite and other
contamination, from the assembly surfaces
of the lower arm.
4
Wipe clean screw and countersink hole on
swing plate.
5
Continues on next page
196 Product manual - IRB 120
3HAC035728-001 Revision: N
© Copyright 2009-2017 ABB. All rights reserved.
4 Repair
4.7.2 Replacing axis-2 motor with gearbox
Continued

Table of Contents

Other manuals for ABB IRB 120

Related product manuals