EasyManua.ls Logo

ABB IRB 2600 - Page 103

ABB IRB 2600
396 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteEquipment
Replace if damaged.O-ring for base cover
Installing an expansion container
Use this procedure to install the expansion container.
InfoAction
See Lifting and turning a suspended
mounted robot on page 71.
Lift the robot using the lifting accessory and
place it in suspended position with the base
free for installation work.
1
Remove the cover and the o-ring from the
base.
2
The screws must be replaced with longer
screws.
Remove the two existing attachment screws.3
Remove the oil plug.4
Apply some grease on the small o-ring and
place it in the recess on the expansion con-
tainer.
5
Place the expansion container in the base
and place it so the drain holes match.
6
Secure the expansion container with the at-
tachment screws and washers.
7
Check the o-ring used on the cover. Replace
it if damaged.
8
Refit the cover on the base with its attach-
ment screws.
9
Turn the robot so it is not suspended.10
See procedure for filling, Changing the
oil, axis 1 gearbox on floor mounted ro-
bots on page 153.
Add 0.4 liters of oil to the gearbox.11
Turn the robot to suspended position.12
See procedure for suspended robot, In-
specting oil level, axis-1 gearbox on
page 121.
Inspect the oil level.13
Product manual - IRB 2600 103
3HAC035504-001 Revision: G
© Copyright 2009-2015 ABB. All rights reserved.
2 Installation and commissioning
2.5.2 Installing an expansion container
Continued

Table of Contents

Related product manuals