EasyManua.ls Logo

ABB IRB 2600 - Page 259

ABB IRB 2600
396 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteEquipment
These procedures include references to the tools
required.
Other tools and procedures may be re-
quired. See references to these proced-
ures in the step-by-step instructions be-
low.
Removing complete tubular shaft unit
Use this procedure to remove the complete tubular shaft unit.
NoteAction
How to drain the oil from the gearbox is
described in section:
Changing the oil, axis-4 gearbox
on page 172
Drain oil from gearbox axis 4.1
xx0800000336
Move the robot to the position shown in the
figure.
2
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
3
xx0800000335
Remove the bracket securing the cable
package to the tubular shaft unit by remov-
ing its attachment screws.
4
Parts:
A: Tubular shaft unit
B: Attachment screws M6x16 qual-
ity 8.8-A2F (2 pcs)
C: Bracket
Continues on next page
Product manual - IRB 2600 259
3HAC035504-001 Revision: G
© Copyright 2009-2015 ABB. All rights reserved.
4 Repair
4.4.2 Replacing complete tubular shaft unit
Continued

Table of Contents

Related product manuals