4 Repair
4.3.2. Replacement of cable harness, axes 1-4
2213HAC020993-001 Revision: G
© Copyright 2004-2008 ABB. All rights reserved.
Refitting, cable harness, axes 1-4
The procedure below details how to refit the cable harness, axes 1-4.
Action Note/Illustration
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
2. In order to facilitate refitting of cable harness,
move the robot to the specified position:
• Axis 1: 0 degrees
• Axis 2: 0 degrees
• Axis 3: 0 degrees
• Axis 4: 0 degrees
• Axis 5: +90 degrees
• Axis 6: no significance
Axes 2 and 3 may be tilted slightly
to improve access.
3. Pull the cable and connectors down through the
cable guide in the center of the frame.
Make sure the cables are not
twisted with each other or with
eventual customer harnesses!
Make a note of the correct positions
of the connectors!
4. Reconnect connectors R1.MP and R1.SMB at the
rear cover plate.
Make a note of the correct positions
of the connectors!
Attachment point is shown in the
figure Location of cable harness on
page 216.
5. Reconnect the earth cable. Attachment point is shown in the
figure Location of cable harness on
page 216!
6. Refit the rear cover plate to the robot with its
attachment screws.
Shown in the figure Location of
cable harness on page 216.
7. Reconnect all connectors at motor 1 and motor 2. Specified and shown in the figure
Location of cable harness on page
216!
Continued
Continues on next page