EasyManua.ls Logo

ABB IRB 6700 Series - Page 601

ABB IRB 6700 Series
846 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1300000732
Pull out the robot cable harness through
the protection tube.
2
Place the cable harness over the balancing
device.
3
Lifting away the complete arm system
Use this procedure to lift away the complete arm system.
NoteAction
Raise the overhead crane to stretch the
chains and roundslings.
1
Make sure that the roundsling between the
wrist and the frame is stretched.
Guide pin, M16x150: 3HAC13120-2
xx1700001635
Remove two attachment screws in opposite
holes and replace them with guide pins.
Tip
Lubricate the guide pins with some grease
to make the frame slide better.
2
Guide pin, M16x200: 3HAC13120-3
xx1700001636
Always use guide pins in pairs.
Continues on next page
Product manual - IRB 6700 601
3HAC044266-001 Revision: N
© Copyright 2013 - 2018 ABB. All rights reserved.
4 Repair
4.8.1 Replacing the axis-1 gearbox (IRB 6700 - 235/2.65, IRB 6700 - 205/2.80, IRB 6700 - 175/3.05, IRB
6700 - 150/3.20, IRB 6700 - 200/2.60, IRB 6700 - 155/2.85)
Continued

Table of Contents

Related product manuals