EasyManua.ls Logo

ABB IRB 6710 - Page 467

ABB IRB 6710
640 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refitting the cable harness in the base
NoteAction
xx2200001924
Run the robot cable harness through the
frame recess and down through the protec-
tion tube.
1
xx1300000736
Run the cabling through the base.
Make sure that the cables are not
twisted. Each cable must be in line
with its position on the base plate.
Make sure that the R1.SMB cable
will run on the correct side of the
R1.MP1, see the figure.
2
Make sure that the markings on the cables
are facing the base cover, when connected.
3
Screw dimension for R1.MP: M6x25 A2-70Connect connectors R1.MP and R1.SMB.4
Tightening torque for R1.MP: 10 Nm.
Tightening torque for R1.SMB: 10 Nm.
xx2100001109
Continues on next page
Product manual - IRB 6710 467
3HAC085695-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.1 Replacing the axis-1 gearbox
Continued

Table of Contents

Related product manuals