EasyManua.ls Logo

ABB IRB 760 Series - Page 187

ABB IRB 760 Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteArt. no.Equipment, etc.
These procedures include refer-
ences to the tools required.
Other tools and procedures may
be required. See references to
these procedures in the step-
by-step instructions below.
Removing, turning disk
Use this procedure to remove the turning disk.
NoteAction
Run the robot to a position where the tilthouse is
best positioned for the turning disk to be replaced.
1
See Synchronization marks and
synchronization position for axes
on page 353.
Note
This is done in order to fascilitate
fitting of the turning disk in the
correct position.
Rotate axis 6 to its calibration position.2
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot working area.
3
Remove any equipment fitted to the turning disk.4
See section
Changing oil, gearbox axis
6 on page 133
Drain the axis 6 gearbox.5
xx1000001134
Remove the attachment screws that secure the
turning disk.
6
Continues on next page
Product manual - IRB 760 187
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.1 Replacing the turning disk
Continued

Table of Contents

Related product manuals