EasyManua.ls Logo

ABB IRB 760 Series - Page 226

ABB IRB 760 Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1100000044
Fill the gaps between upper and lower arms
shown in the figure, with rust preventive
(Mercasol 3106).
22
Refitting the upper arm - concluding procedures
Use this procedure for the concluding refitting of the upper arm.
NoteAction
See section
Replacing the parallel rod on
page 253
Refit the parallel rod.1
See section
Replacing the tilthouse unit on
page 191
Refit the tilthouse unit.2
See sections:
Replacing linkage - upper link arm
on page 228
Replacing the linkage - lower link
arm on page 235
Replacement of linkage - link on
page 242
Refit the linkage system.3
See section
Replacing the cable harness, upper
end (incl. axis 6) on page 163
Refit the cable harness.4
Move the robot to synchronization position.5
See section
Replacing the balancing device on
page 278
Refit the balancing device.6
Continues on next page
226 Product manual - IRB 760
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.3 Replacing the upper arm
Continued

Table of Contents

Related product manuals