EasyManua.ls Logo

ABB IRB 760 Series - Page 229

ABB IRB 760 Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Required equipment
NoteArt no.Equipment
For spare part no. see:
Spare parts on
page 393
Upper link arm
Replace if damaged.For spare part no. see:
Spare parts on
page 393
Spherical roller bearing
(2 pcs)
Replace if damaged.For spare part no. see:
Spare parts on
page 393
Support washer
(2 pcs)
Tribol GR 100-2 PD3HAC9408-1Bearing grease
Loctite 2433HAB7116-1Locking liquid
Permatex No 312360012-202Sealing compound
3HAC039305-001Assembly tool, linkage
Standard-KM10 socket
Content is defined in section Stand-
ard tools on page 389.
-Standard toolkit
These procedures include references
to the tools required.
Other tools and procedures
may be required. See refer-
ences to these procedures
in the step-by-step instruc-
tions below.
Removing the upper link arm
Use this procedure to remove the upper link arm of the linkage system.
NoteAction
Check especially that it is possible to re-
move the lock nut at the link.
Put the robot in a position where it is possible
to reach all parts that shall be removed.
1
xx1000001132
Let the tilthouse unit rest on a workbench, on
some pallets or similar.
This is done in order to prevent the tilthouse
from falling downwards when the upper link
arm is removed.
CAUTION
In order to avoid accidents, also secure the
tilthouse unit in an overhead crane or similar.
2
Continues on next page
Product manual - IRB 760 229
3HAC039838-001 Revision: M
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.4.4 Replacing linkage - upper link arm
Continued

Table of Contents

Related product manuals