EasyManua.ls Logo

ABB NGC8206 - Figure 3-12 ENC82 L-Pipe Mount Installation; Figure 3-13 ENC82 L-Chain Retainer Lock

ABB NGC8206
239 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
101510 Rev. AG Page 3–
13
10) Screw nut onto all-thread until top of nut is level with top of all-thread. Final
tightening may be done after mounting chain is in place.
Lift enclosure above meter run, allowing enough clearance to
clear the pipe.
11) Set the enclosure on top of the pipe in-between the angle iron mounting
brackets. Keep the unit steady on top of the pipe.
12) Wrap mounting chain underneath pipe (see Figure 3-12). Feed chain up through
square retainer hole of angle iron and pull up until most of the slack has been
taken out of the mounting chain.
13) Feed long flat end of the chain retainer (see Figure 3-13) through the middle of a
chain link then move the retainer lock into position where round peg fits into small
round mounting hole.
Figure 3-12 ENC82LPipe Mount installation
Figure 3-13 ENC82LChain Retainer Lock
14) Adjust enclosure into final position on the pipe and tighten nut on all-thread
(adjustment assembly) until unit is securely in place.
15) Adjust enclosure position on angle iron if necessary then tighten bolts until
secure.
(31.00)
VIEW A-A
VIEW B-B
VIEW B
VIEW A

Table of Contents

Related product manuals