Initial Startup of the Controller
Once all relevant installation procedures are performed as defined in respective system quick start
guides and associated system documentation, the system is ready to be powered up.
Step Action
1
Obtain the appropriate quick start guide for the product to be powered. Thoroughly
read through all information and follow all relevant instructions and steps. Verify all
2
If equipped, place all external battery disconnect switches into their ON positions
prior to applying AC power.
3 Apply power to the power system.
4