Initial Startup of the Controller
Once all relevant installation procedures are performed as defined in respective system quick start
guides and associated system documentation, the system is ready to be powered up.
Step Action
1
Obtain the appropriate quick start guide for the product to be powered. Thoroughly
read through all information and follow all relevant instructions and steps. Verify all
2
If equipped, place all external battery disconnect switches into their ON positions
prior to applying AC power.
3 Apply power to the power system.
4
ho
o o
maintenance
operations that should be initiated are the Clear Events and
alarm
LED is illuminated, review the installation procedure and refer to the
6

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Pulsar Edge and is the answer not in the manual?

ABB Pulsar Edge Specifications

General IconGeneral
BrandABB
ModelPulsar Edge
CategoryController
LanguageEnglish

Related product manuals