2.3.6.16 LD0.EFPADM3 Admittance-based earth-fault protection (3)
Table 46: LD0.EFPADM3 Admittance-based earth-fault protection (3)
IEC 61850 name SA name Description Values
LD0.EFPADM3
.Str.general START Stage3 start 1=Start
.Op.general OPERATE Stage3 operate 1=Operate
2.3.6.17 LD0.WPWDE1 Wattmetric-based earth-fault protection (1)
Table 47: LD0.WPWDE1 Wattmetric-based earth-fault protection (1)
IEC 61850 name SA name Description Values
LD0.WPDSE1
.Str.general START Stage 1 start 1=Start
.Op.general OPERATE Stage 1 operate 1=Operate
2.3.6.18 LD0.WPWDE2 Wattmetric-based earth-fault protection (2)
Table 48: LD0.WPWDE2 Wattmetric-based earth-fault protection (2)
IEC 61850 name
SA name Description Values
LD0.WPDSE2
.Str.general START Stage 2 start 1=Start
.Op.general OPERATE Stage 2 operate 1=Operate
2.3.6.19 LD0.WPWDE3 Wattmetric-based earth-fault protection (3)
Table 49: LD0.WPWDE3 Wattmetric-based earth-fault protection (3)
IEC 61850 name
SA name Description Values
LD0.WPDSE3
.Str.general START Stage 3 start 1=Start
.Op.general OPERATE Stage 3 operate 1=Operate
2.3.6.20 LD0.HAEFPTOC1 Harmonics-based earth-fault protection (1)
Table 50: LD0.HAEFPTOC1 Harmonics-based earth-fault protection (1)
IEC 61850 name
SA name Description Values
LD0.HAEFPTOC1
.Op.general OPERATE Stage operate 1=Operate
.Str.general START Stage start 1=Start
Section 2 1MRS757807 B
DNP3 data mappings
30 Remote Monitoring and Control REC615