3-8 Machine Maintenance Procedures
Getting Started 0
The flowchart in Figure 3-1 identifies sections illustrating the entire removal and install
sequence. Observe the order of the sequence to avoid damage to any of the hardware
components.
Perform the following prior to performing any maintenance procedures:
1. Remove power (A) from the system and peripherals.
2. Remove all cables from system.
Figure 3-3. AC Adapter
3. Place system on a stable work surface.
SG_JE50_HR.book Page 8 Thursday, December 23, 2010 3:47 PM