EasyManua.ls Logo

Additel 761A - Page 143

Default Icon
151 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
129
1) Control the pressure with the set pressure value as the target value.
2) After stabilization (the real-time pressure value turns green), stop the control and switch to the
measurement mode, and count down the waiting time.
3) Record the pressure at the end of the waiting time as the starting pressure.
4) Start the test, count down the test time, and start to calculate the real-time leakage amount at
the same time. The real-time leakage amount = the starting pressure - the real-time pressure.
5) Record the pressure at the end of the test time as the end pressure, and then vent the
calibrator to the atmosphere.
6) The final leakage amount = the starting pressure - the ending pressure.
7) During 4), press on the right side of the screen to stop this test, and press and to
switch between the forms of table and graph.
8) After the test, click the save icon on the right side of the screen to execute the save operation
for this test.
External pressure module
1) Connect the pressure module.
2) Apply pressure to desired pressure for the leak test.
3) Press the key or the start icon on the right side of the screen to start execution and start
the countdown of the waiting time. Record the real-time pressure at the end of the waiting time as the
starting pressure.
4) Start the test, count down the test time, and start to calculate the real-time leakage amount at

Table of Contents

Related product manuals