56 Maintaining Your GC
4 Maintaining the Split/Splitless Inlet
9
Blow the inside of the inlet dry with compressed air or
nitrogen.
10 Install the gold seal and reducing nut.
11 Install the liner and O-ring.
12 Install the column. (See “To Install a Capillary Column with
the Split/Splitless Inlet” on page 40.)
13 Check for leaks.
14 Bakeout contaminants. (See “To Bakeout Contaminants from
the Split/Splitless Inlet” on page 57.)
15 Restore the analytical method.