Maintaining the Purged Packed Inlet 5
Maintaining Your GC 79
12 Install the adapter, if used. (See “To Install an Adapter on the
Purged Packed Inlet” on page 72.)
13 Install the glass liner and O-ring. (See “To Change the Glass
Liner on the Purged Packed Inlet” on page 75.)
14 Install the top insert weldment and finger-tighten.
15 Install the septum and septum nut. (See “To Change the
Septum on the Purged Packed Inlet” on page 68.)
16 Attach the column. (See “To Install a Capillary Column with
the Purged Packed Inlet” on page 64.)
17 Check for leaks.
18 Restore the analytical method.
19 Set the septum and glass liner counters.