6. Startup & Commissioning
6.1 Pre instruction
6.2
Filter house
Filter house: Make sure to ush the supply line in front of the rst lter before adding the water to our system
If the water isn’t clear, rinse until you have clean water before adding it to the system
Fill out AirtecCare with °dH / PPM, µS level, appearance and smell “raw water supply”
• Close and connect the water supply again to the lterhouse
• Insert lter elements to all lterhouses
• Leave the water supply closed / OFF
Before startup ensure that
you have the following
ready:
AirtecCare service sheet
Tool to messure water temperature
Tool to messure water conductivity µS or PPM
Tool to messure water hardness °dH
Multimeter
Startup in 4 steps 1. From water supply – lter – softener – carbon lter
2. RO system
3. HydroSens - sensors
4. Zone - atomizers
Start with the water line before electricity. Ensure that all electrical boxes is closed and the cover is on before putting water to the system.