EasyManua.ls Logo

Airtec RO Plus l - Basic

Default Icon
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
6. Startup & Commissioning
Before you start:
• Take the 10 mm hose from RO permeate and disconnect it at the tank and put it to the drain.
•
Slowly turn on water supply to avoid pressure boost.
Power on:
• Connect power supply.
• System will startup and open water inlet, permeate production starts.
• Let the system run in this position until all air is out of the membrane.
Adjust drain %:
• Measure and note the permeate water ow l/h.
• Measure and note the drain water ow l/h.
• Adjust the 1/4” drain needle valve until the required drain ow is reached:
min. 30 % with softener. - Use formula ”with softener” to calculate.
min. 50 % without softener. - Use formula ”without softener” to calculate.
• Lock the valve with the designated nut.
• Disconnect power supply to stop the water ow.
• Reconnect the 10 mm permate hoses to the tank.
• Reconnect power supply.
Produce tank with
permeate water:
• Produce one tank of permeate water and drain it o.
• Produce one more tank.
Terminate air in the
booster supply pump:
• Take the 3/4” hose going to the consumer and put it to drain.
• Open the valve on the tank, PM2 default starts in alarm - press reset.
• Wait until the 3/4” hose has a clean water ow without air. The pump should now be
producing water pressure.
• Close the valve on the tank.
• Reconnect the consumer hose.
• Open the valve on the tank again.
Water sample:
• Take a water sample from the designated tab, let the water run for 1 min. before taking the
sample.
• Messure µS/cm.
• Normal limit 5-30 µS/cm, in clean water areas µS/cm can drop to 0.
• This can have a negative eect on some processes.
End with:
• Check that the water inlet pressure during RO production is min. 3 bar .
• Check for leaks.
• Fill out AirtecCare checklist.
Terminate air in the
booster supply pump:
• Take the 3/4” hose going to the consumer and put it to drain.
• Turn on fuse F2 6A, PM2 default starts in alarm - press reset.
• Wait until the 3/4” hose has a clean water ow without air, the pump should now be producing
water pressure.
• Turn o fuse F2.
• Reconnect the consumer hose.
• Turn on fuse F2.
Water sample:
• Take a water sample from the designated tab, let the water run for 1 min. before taking the
sample
• Messure µS/cm.
• Normal limit 5-30 µS/cm, in clean water areas µS/cm can drop to 0.
• This can have a negative eect on some processes.
End with:
• Check for leaks.
• Fill out AirtecCare checklist.
6.7 RO Basic™
201218

Table of Contents