EasyManua.ls Logo

Airtec RO Plus l - Atomized Water Bio Test (Optional); Disinfection

Default Icon
135 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
65
8. Service
8.12 Atomized water bio test (optional)
8.13
Disinfection
Take a water sample from the last nozzle on a string. • Let the system run for 2 min.
• Disinfect the test point nozzle with alcohol and fire.
•
Be aware of ATEX and fire regulations.
• Carefully avoid any contamination of the sample, fingers, dust etc.
• Use a bottle from an approved laboratory.
The test – accordingly with VDI 6022 guidelines. • Legionella – limit 100 KBE/ml
• 20 ⁰C bacteria - limit 1000 KBE/ml
• 36 ⁰C bacteria – limit 1000 KBE/ml
Should the test fail. • The reason for this need to be found and analyzed
• Proper preventive measures implemented
• See troubleshooting guide
A disinfection should be conducted if. • 2 consecutive bio tests show exceeding values.
Procedure for disinfection. • Follow all local rules and regulations.
• Relevant areas should be sealed off so that no persons can enter during the
process.
•
Carefully read and follow the instructions for a suitable disinfectant.
• Description below is based on the use of Kickstart.
• Measure and note the existing PH value of the water at the most distant
atomizer.
• Install a dosing system at the water inlet of the system, prior to water
treatment.
• Set the dosing system to produce a 1 to 2 % mix.
• If the system is equipped with an RO system, empty the tank and let the RO.
Produce a full new tank that includes the disinfection mix.
• Measure and note the PH value of the mix.
• Remove a nozzle on the unit, furthest from the pump or if it splits in more
than one line, you have to remove the last nozzle on each line.
• Insert a 10mm sliplock fittings, and attach a 10 mm hose to a 5 or 10 l clear
bucket
• Start up only this one zone - remember to deactivate flow alarm.
• Run the zone until the mix is all the way to the bucket. System volume 10mm
hose is 2,8 l per 100 m.
• Stop the zone and repeat this with all zones.
• Leave the mix to work for 30 minutes.
• Remove the dosing equipment or empty the RO tank.
• Connect pump supply to clean water line again.
• Startup one zone at the time, and flush it until you have clean water in the
bucket.
• Repeat this for all zones.
• Properly ventilate the rooms.
• Unseal the areas.
201218

Table of Contents