EasyManua.ls Logo

AISIN SEIKI E1 Series - Page 255

Default Icon
317 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
253
TROUBLESHOOTING
Code No. /
functions
Operational procedure / display contents
08
Energy
saving test
operation
Monitor mode
Displays status of the energy saving test operation.
When energy saving test operation is in progress
Display of energy save
"E" is always displayed.
Status are as follows
tSt : Energy saving test operation in progress
oFF : Energy saving test operation OFF
When energy saving test operation is OFF
Command mode
Programs energy saving test operation setting.
Energy saving test operation is available "During system stop (outdoor units stopped and all
remote controllers OFF)" only. If the outdoor unit starts operation during energy saving test
operation, energy saving test operation is terminated.
Method of energy saving test operation setting
Select command (Initial display)
In the case of change
"Test operation OFF start"
In the case of change
"Test operation in progress cancel"
Press [SET] switch
Press [SET] switch
During command setting
Switching with [UP] or [DOWN] switch
Press [SET] switch
Press [SET] switch
Return to select command (setting is completed)
Energy saving test operation setting Completed
Energy saving test operation starts. Energy saving test operation is cancelled.
Energy saving test operation is finished automatically in 10 minutes.
Energy save
Status

Table of Contents