Part III: Link testing
Overview
...................................................................................................................................................................................................................................
Purpose
This part of the 1643 AM/AMS Installation Guide contains the physical network
installation and the recommended link test procedures.
Contents
This part of the document contains the following chapters:
• Chapter 8,
Link testing
• Chapter 9,
Conclusion.
Entry checklist
The following provides a checklist to be completed prior to perform the link testing.
Verify that each procedure has been completed. Check off and initial the item.
Procedure Completed Initials Notes
Have all procedures been completed which are
required in Chapter 7, “NE provisioning and
stand alone installation test exit checklist”
(p. 7-28))?
Is the Element Management System OMS
available?
Is the following test equipment available?
• Optical power meter
• SDH Analyser