EasyManua.ls Logo

Alcatel-Lucent 1643 AMS - Part II: NE Provisioning and Stand-Alone Installation Test

Alcatel-Lucent 1643 AMS
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Part II: NE provisioning and stand-alone
installation test
Overview
...................................................................................................................................................................................................................................
Purpose
This part of the 1643 AM/AMS Installation Guide contains the ITM-CIT and NE
software installation, the NE provisioning, and the stand-alone test procedures.
Contents
This part of the document contains the following chapters:
Chapter 6,
ITM-CIT installation and NE provisioning
Chapter 7,
Stand-alone test procedures.
Entry checklist
The following checklist provides tasks to be completed prior to performing the
ITM-CIT installation, NE provisioning and stand alone installation tests. Verify that
each procedure has been completed. Check off and initial the item.
Procedure Completed Initials Notes
Have all procedures been completed which are
required in Chapter 5, “Physical and power
installation exit checklist” (p. 5-8))?
Is the ITM-CIT and NE software available?
Is a laptop or desktop PC available meeting
the minimum requirements (see section
“Requirements” (p. 2-14))?
Is a crossed LAN cable CAT5 with 4-wire
RJ-45/RJ-45 connectors available?
Is the required test equipment available (see
section “Test equipment and accessories”
(p. 7-3))?
...................................................................................................................................................................................................................................
365-312-802R7.2
Issue 4, June 2007
Alcatel-Lucent - Proprietary
See notice on first page
II-1

Table of Contents

Other manuals for Alcatel-Lucent 1643 AMS