4. Have another person hold the switch at the desired location in the
equipment rack while you secure it using four standard equipment rack
screws (not provided). Refer to Figure 55.
Figure 55. Installing the Switch in an Equipment Rack
5. After installing all the switches of the stack, do one of the following:
To build the stack with the default stacking ports, refer to Chapter
7, “Building the Trunk with the Default 10Gbps Stacking Ports” on
page 141.
To build a stack of x530L-10GHXm or x530L-18GHXm switches
using 5Gbps ports for the trunk, refer to Chapter 8, “Building the
Stack Trunk with 5Gbps Multi-Speed Ports” on page 161.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis x530L Series and is the answer not in the manual?

Allied Telesis x530L Series Specifications

General IconGeneral
BrandAllied Telesis
Modelx530L Series
CategorySwitch
LanguageEnglish

Related product manuals