1.1.2.1 Notification of commissioning and first check (only for Italy).
In Italy, the owner of the Elevating Work Platform (PLE) must report its commissioning to INAIL and submit
it to mandatory periodic checks. The first check is carried out by INAIL within sixty days from the request,
after which the employer can make use of the ASLs or authorized public or private entities.
Subsequent checks are carried out by the aforementioned subjects, who provide them within thirty days
from the request, after which the employer can make use of authorized public or private subjects. The
checks are expensive and the costs for their execution are borne by the owner of the machine. To carry
out the checks, the territorial supervisory bodies (ASL / USL or ARPA) and INAIL may avail themselves of
the support of authorized public or private entities. Authorized private entities acquire the qualification
of public service officers and report directly to the public structure that holds the function.
To report commissioning in Italy, it is necessary to connect to the INAIL portal following the instructions
on the portal itself.
INAIL will assign a serial number and during the First Inspection, will fill in the "technical identification
sheet", reporting on it only the data detectable by the machine already in service or inferable from the
instruction manual. This document will be an integral part of the machine documentation.
1.1.2.2 Periodic checks following the first check.
In Italy, compulsory periodic checks take place annually. For their performance, it is necessary that the
owner of the PLE makes a request by registered letter to the supervisory body (ASL / USL or ARPA or other
authorized public or private subjects) competent for the territory at least twenty days before the end of
the year from the time of past verification.
It should be noted that, if a machine without a valid verification document is moved on the territory in
an area outside the competence of the usual supervisory body, it is the owner's obligation to request the
annual check from the supervisory body competent for the new territory. in which the machine is to
operate.
1.1.2.3 Transfers of ownership of the PLE.
In Italy, in case of transfer of ownership, the previous owner of the PLE is required to communicate the
unavailability of the machine by connecting to the INAIL portal.
The new owner will have to retrieve the registration data of the PLE on the same INAIL portal, in order
to continue to subject the machine to the periodic checks required by law.
The new owner must in any case obtain from the previous owner the accompanying documentation
already mentioned in the previous chapters (see SUPPLIED DOCUMENTATION).
To take advantage of the WARRANTY and to receive any updates and SERVICE BULLETINS, the new owner
must report to ALMAC SRL that he has taken possession of the machine by means of written
communication using the forms provided at the end of this manual.