EasyManuals Logo

Applied Biosystems StepOne User Manual

Applied Biosystems StepOne
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #128 background imageLoading...
Page #128 background image
DRAFT
September 25, 2007 1:07 am, 4376782_Maintain_the_System.fm
Chapter 6 Maintain the System
Regular Maintenance
Applied Biosystems StepOne
and StepOnePlus
Real-Time PCR Systems
Installation, Networking, and Maintenance Guide
106
Notes
8. While the instrument is running calibration plate 1, prepare calibration plate 2 by
performing steps 4 through 7 on page 104.
9. When the wizard prompts you to do so, load and run calibration plate 2:
a. Open the instrument drawer.
b. Remove the calibration plate 1 from the sample block(s) and discard it.
c. Place calibration plate 2 in the sample block(s) so that the A1 position is at the
back-left corner.
d. Close the instrument drawer carefully.
e. In the Dye Calibration Setup wizard, select Plate 2 is loaded in the
instrument, click Continue Calibration.
10. When the instrument completes the calibration, unload calibration plate 2:
a. Open the instrument drawer.
b. Remove the calibration plate 2 from the sample block(s) and discard it.
c. Close the instrument drawer carefully.
Analyze the
Calibration Data
1. After the calibration is complete, confirm the status of the calibration:
Passed – The instrument passed the calibration. Go to step 2a.
Failed – The instrument failed the calibration. Troubleshoot the error as
described in
“Dye Calibration Failure” on page 134
.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Applied Biosystems StepOne and is the answer not in the manual?

Applied Biosystems StepOne Specifications

General IconGeneral
BrandApplied Biosystems
ModelStepOne
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals