D41 15
1.2 Preparation for transportation
- Close the hopper with switch (17).
- Engage both hopper transport safeguards.
- Lift the screed completely using switch (24)
- Turn the travel drive preselector (5) to zero.
- Push the drive lever (6) into its centre position.
- Fully extend the levelling cylinders with switch (19),(20)/(18).
- Adjust the screed to its basic width with switch (36),(37)
Lift the auger if needed!