When work is finished
- Run the paver finisher empty and stop it.
- Lift the screed by using switch (24).
- Retract the screed parts to the basic screed width and lift the auger. Where
applicable, completely extend the levelling cylinders.
Block the tow arm after the screed lifted.
- While operating the tampers at a low speed, let any material residues drop out.
- Set the drive lever(6)to the centre position and the speed adjuster(5)to minimum.
- Switch the screed heater system off.
- Switch off the ignition .
- With a screed with gas heating system(O), close the main shut-off valves and the
bottle valves.
- Remove the levelling units and stow them away in the boxes, close all flaps.
- Remove all parts that extend beyond the paver finisher contour or secure them if
the paver finisher is to be transported over public roads on a low-bed trailer.
- Read and check the operating hour meter to determine whether maintenance
work must be performed (see chapter F).
- Cover and lock the operating panel.
- Remove material residues from the screed and the paver finisher and spray all
parts with separator fluid.
After paving, make sure material residues on the track shoes removed timely and
the caterpillar chains free of any material residues / fillings in between.