C11 3
Only when remote control is not connected.
- Close the hopper lids.
- Engage both hopper transport
safeguards.
1 = Locking handle
2 = Locking latch
3 = hopper
- Lift the screed.
- Turn the preselector to “zero”.
- Extend levelling cylinders
completely.
- Set the drive lever to centre
position.
- Retract the screed parts until the
screed matches the basic width
of the paver finisher.