EasyManua.ls Logo

Atom IncuArch - 11-1-3. Inspection Checklist - After Use

Atom IncuArch
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and Inspection
80
11-1- 3.
Inspection Checklist - After Use
Device Name IncuArch
Date of
Inspection
Serial No. Inspector
Check the following points after using the unit.
No. Inspection Item to check Yes/No
1 Main body
(1) Are the main body and hood free of damage and not deformed in
any way?
(2) Are the packings free of deterioration and attached securely?
[Tube introduction slit packings, snap-open access port packings,
oxygen sensor attaching port packings, and packing for main
body]
(3) Do the admittance panel latches function correctly?
When the admittance panels are fully closed, do they stay locked
in place when they are pushed from the inside?
(4) Are the press levers of the snap-open access ports secured tightly
and able to work correctly to open and close the snap-open access
ports?
When the snap-open access ports are fully closed, do they stay
locked in place when they are pushed from the inside?
2 Operation
(1) Does the power switch turn the power on and off reliably?
(2) Battery
inspection:
When running on battery power, did the remain-
ing charge indication change too quickly?
* See
z
Environmental conditions for inspection
(guideline)” on p. 77.
3
Overall
judgment
(1) Are any abnormalities discovered after performing the above
inspections?
(2) Are there any parts that have passed the period of use?

Table of Contents

Related product manuals