EasyManua.ls Logo

Avaya Aura System Platform - Installing and connecting the S8800 Server

Avaya Aura System Platform
104 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13 NIC for High Availability (eth2)
The following picture shows the server, (the front of the server is on the bottom left). When
facing the front of the server, the NIC card is installed in the back right corner. The middle PCI
slot is empty.
1 Additional NIC for High Availability (eth2)
Installing and connecting the S8800 Server
Server installation checklist
#
Task Notes
1 Verify that all equipment is on
site.
Compare the list of items that were ordered
to the contents of the boxes. Use the
inventory list provided by your project
manager. Do not rely on the packing slips
inside the boxes for the correct information.
2 Verify that the rack is installed
according to the manufacturer's
instructions and in accordance
with all local codes and laws.
Installing and connecting the S8800 Server
Installing and Configuring Avaya Aura
System Platform April 2010 31

Table of Contents

Related product manuals