5-46
Chapter 5. DETAILED DESCRIPTION OF EACH FUNCTION
STEP PV start
Whether or not the PV start exists and its type at start of the step operation can be
set.
Item (Bank) Display Contents Initial value User level
STEP PV start
(Setup bank)
0: None
1: Up start
2: Down start
0 High function
• When this setting is set at “0”, the step operation is started from the SOAK
portion of step 1.
• When this setting is set at “1”, the step operation is started from the same SP as
PV in the up RAMP portion of step 1 if PV<SP-1. If PV≥SP-1, the step operation
is started from the SOAK portion of step 1.
• When this setting is set at “2”, the step operation is started from the same SP
as PV in the down RAMP portion of step 1 if PV>SP-1. If PV≤SP-1, the step
operation is started from the SOAK portion of step 1.
SP-1
Step 1
READY
Operation start from SOAK of step 1
Step 2
Step 3
Time
SP-1
Operation start from up RAMP of step 1
SP
Step 1READY Step 2 Step 3
Ramp of step 1
SP-1
PV at start
Operation start from down RAMP of step 1
Ramp of step 1
Step 1READY
Step 2 Step 3
Time
SP