EasyManua.ls Logo

BARTEC BENKE CFPP-4.2 - 10.16 Remove the cover of the measuring cell housing

BARTEC BENKE CFPP-4.2
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance 95
03/2016 CFPP Process Analyzer CFPP-4.2
CAUTION!
Very cold co
mponents and product!
Risk of skin damage on direct contact.
FOR THIS REASON:
- Wear protective gloves and protective goggles.
- Hold the measuring cell only by its upper transparent plastic parts.
Fig. 10.18: Measuring cell (installed)
1 Plug nipple for black pipe
2 Plug nipple for red pipe
3 Plug nipple for green pipe
4 Connectors for the temperature
sensors
5 Connectors for the liquid sensor
6 Screws decondensation ring
7 Quick-release coupling of the red
pipe
8 Quick-release coupling of the
green pipe
9 Fixing screw
10 Union nut sample temperature
sensor
11 Decondensation ring
12 Drain pipe
The correct mounting position can be checked by the position of the drain pipe (12).
Slowly lower the measuring cell.
Replace the fixing screws (9) and tighten them hand-tight.

Table of Contents

Related product manuals