Transport - Installation
A: R82GB0DA.PMD
B: R82DE0DA.PMD
E: 080403 / T. Wenger
G: 020403 / TCS
Section 4
Page 1
4 Transport - Installation
4.1 General
Upon delivery, the handling device (hereafter
referred to as the ”robot”) it must be checked
immediately for any damage and for
completeness.
The scope of delivery also includes:
Operating Manual
Data carriers with the required
software
Dummy plugs for bypassing
EMERGENCY STOP
(refer to 4.3 Commissioning)
All keys, e.g. for the switch cabinet, enclosures
etc. can be found at the main switch.
We recommend you arrange for the robot to be
assembled by Battenfeld engineers. We cannot
accept liability for any damage resulting from
improper assembly.
4.1.1 Storage
All robots are adequately packaged in order to
prevent any damage occurring in transit. The
robot must be put into operation immediately
after it has been delivered by the transport
company.
Contact our Customer Services department if
the robot is to be stored for a prolonged period
of time.
4.1.2 Unloading
We cannot guarantee the robot will function
perfectly or accept any guarantee claims
unless it has been unloaded in the proper
manner.
The robots may only be transported and
lifted horizontally on the special transport
and loading elements The lifting gear must
be secured to prevent it from slipping.
The crane carrying capacity and the lifting
gear must be at least the same weight as the
robot. (refer to Installation layout– Section
3.0 Specifications)
Do not stand inside the danger area around
suspended loads!