STARTUP / SHUTDOWN
SYSTEM POWER UP PROCEDURE
2
2. Since the instrument is powered down, the trainee will need either a printed copy of the
Powering Up the System and Logging On procedure or a computer near the instrument
displaying that procedure. The procedure is located under
Heading 5.3 POWERING UP AND
LOGGING ON/POWERING DOWN AND LOGGING OFF,
in the Instructions for Use manual.
D Topic Notes and Tasks
1. The System Power Up procedure turns on the Workstation and the Analyzer in a specific
sequence to avoid damage to the instrument and maintain good communications
between the Workstation and the Analyzer.
2. Have the trainee power up the instrument using the
Powering Up the System and Logging On
procedure.
3. Give the trainee a copy of the
SYSTEM POWER UP SUMMARY from this Training Guide and
review the procedure. If the laboratory plans to power down as part of Shutdown, point
out that they can use this summary for Startup instead of the
STARTUP SUMMARY.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Beckman Coulter COULTER ACT 5diff and is the answer not in the manual?

Beckman Coulter COULTER ACT 5diff Specifications

General IconGeneral
BrandBeckman Coulter
ModelCOULTER ACT 5diff
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals