EasyManua.ls Logo

Belmont FMS2000 - Service and Preventive Maintenance Schedules

Belmont FMS2000
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Preventive Maintenance/System Operational Check-Out
7-84
For your convenience, two preventive maintenance schedules have been provided.
Schedule 1: should be performed by either the Clinical User or a Biomedical Technician
(BMET).
Schedule 2: should be performed by either a BMET or other qualified service personnel.
Schedule 1
To be performed by either the Clinical User or a Biomedical Technician (BMET).
Routine Maintenance
Interval
Before or
After Each
Use
Every
Month
Every 6
Months
1. Clean and/or Disinfect Exterior, if necessary.
2. Clean Fluid Out and In-Line Air Detector.
3. Check the Power Cord.
4. Clean Temperature Probes
5. Check/Clean the Fan Guard.
6. Check the System Seal.
7. Check Instrument Door and Ceramic Disk.
8. Check Rubber Feet.
A.
SERVICE AND
PREVENTIVE MAINTENANCE SCHEDULE

Table of Contents

Other manuals for Belmont FMS2000

Related product manuals