EasyManua.ls Logo

Belmont FMS2000 - Schedule 2

Belmont FMS2000
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Preventive Maintenance/System Operational Check-Out
7-85
Schedule 2
To be performed by either a BMET or other qualified service personnel.
Required Test/Verification
Interval
Every 6
Months
Every
Year
Every
5000 Hrs
1. Perform Visual Inspection.
2. Perform System Operational Check-Out,
including the Audible Alarm Test.
3. Check the battery for rated voltage and
check battery run time. Replace batteries
when operating time is marginal or after 3
years.
4. Perform Electrical Safety Test.
5. Hardware Verification.
6. Clean Pump Head
7. Replace Pump Motor.
8. Replace Valve Motor.

Table of Contents

Other manuals for Belmont FMS2000

Related product manuals