EasyManua.ls Logo

BIFFI ICON 2000 - Checks to be Performed before Installation

Default Icon
292 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Checks to be performed before installation
- Make sure the valve to be motorised is the appropriate one for coupling to the actuator
- The electrical supply cables must be suitable for the power rating (see the test certificate
that comes with the actuator).
- Gather the right tools for the assembly and for setting the actuator controls.
If a long storage period has occurred, before reinstalling the actuator, please:
- check the status of the O-ring seals;
- check the installation of the plugs or cable glands on the cable entries;
- check whether the enclosure covers or the actuator body are cracked or broken;
- check the oil level in the actuator and top up if necessary;
- put the batteries back into place (see Sect.618/3 chapt. M par.3).
11
© Copyright by BIFFI Italia. All rights reserved.
“ICON2000”
instruction and operating manual
Section 618/1 chapt. B
Section 618/1

Table of Contents

Related product manuals