3. Checks to be performed before installation
- Make sure the valve to be motorised is the appropriate one for coupling to the actuator
- The electrical supply cables must be suitable for the power rating (see the test certificate
that comes with the actuator).
- Gather the right tools for the assembly and for setting the actuator controls.
If a long storage period has occurred, before reinstalling the actuator, please:
- check the status of the O-ring seals;
- check the installation of the plugs or cable glands on the cable entries;
- check whether the enclosure covers or the actuator body are cracked or broken;
- check the oil level in the actuator and top up if necessary;
- put the batteries back into place (see Sect.618/3 chapt. M par.3).
11
© Copyright by BIFFI Italia. All rights reserved.
“ICON2000”
instruction and operating manual
Section 618/1 chapt. B
Section 618/1