Loading...
9-13
Bosch Security Systems 05/10 BLCC100I
Solution 16
plus
Installation Manual Comms Programming
This menu allows the master user to select which event types will
be reported using the email reporting function. By default the
rst 4 options are set to report via email. Follow the procedure
below to congure the required options.
1) Enter your Master PIN + [MENU].
2) Enter [5] + [5] + [9] + [OK].
The keypad will display the list of current options.
Options with a preceeding tick mark are selected.
Open / Close
Zone Alarm
Zone Trouble
Press
 OK ON OFF MENU
3) Use the [] and [] keys to highlight the feature that you want
to program, then use the [ON] and [OFF] keys to turn on and o
the features as required.
4) When all email options are programmed, press [OK] to save and
exit, or press [MENU] to exit without saving.
Open / Close Reports
This option allows the control panel to report open’ and close
reports via email.
Zone Alarm Reports
this option allows the control panel to report zone alarm and
‘restore reports via email.
Zone Trouble Reports
This option allows the control panel to report zone ‘trouble
and restore reports via email when a user turns on an area that
has faulted zones.
System Reports
This option allows the control panel to report via email
numerous system reports (e.g. AC Fail, Low Battery etc) via
email.
Access Reports
This option allows the control panel to report via email when
a valid token has been swiped eg. Access Granted’ or Access
Denied’.
COMM S T EST I NG
Comms > Comms Test >
Send Test Report
-
-
MENU 5-9-0
This menu allows you to test the reporting functions of the
Solution control panel by manually sending a Test report to
the receiving party (i.e. security company monitoring station,
mobile telephone etc).
1) Enter [MENU] + [5] + [9] + [0]. The keypad will prompt that it is
in the process of sending a test report.
Comms Testing in
progress. Please wait..
Press OK or MENU
2) If the test is successful, the keypad will prompt:
Communication Test
Successful.
Press OK or MENU
3) If the test fails, the keypad will prompt:
Test Report Failed
Please Call for service.
Press OK or MENU
4) Press [OK] or [MENU] to exit.
Comms > Comms Test >
Test Report Time
MENU 5-9-1
Test Time
02 : 00 am
HH MM
This menu programs the time of the day that the panel will
send the automatic Test Report to the base station receiver.
Automatic test reports are used to verify the panels ability to
report events via the telephone line on an ongoing basis.
1) Press [MENU] + [5] + [9] + [1]. The keypad will display the
current Test Report Time.
Test Report Time
02:00am
Press  OK to SAVE
2) Use the left, right, up and down arrow keys to select the Test
Report time required then Press [OK] to save and exit or press
[MENU] to exit without saving.
i
Note
Scroll through the hours using the up and down arrow keys to
change the time from am to pm.