Figure 201
!
This procedure prescribes that:
- The fuel pipelines (from pumping elements to
injectors, bleeding recovery pipes from injectors
to pump, LDA pipeline and feed provided by
priming pump) shall all be disassembled.
- Electrical connection to feed pump shall be
disconnected.
- Accelerator cable shall be disconnected.
Feed pump unit assembly and disassembly
procedure
In case feed pump replacement is necessary, this shall be
supplied pre−set already as spare part.
On the other hand, in case the pump shall be disassembled
and reassembled later on without being repaired it will be
necessary to pr−set it while it is still assembled to the engine
and disassemble it only afterwards.
The following procedure analyses this second hypothesis
since it is the more complex.
Figure 202
75714
1
2
- Disassemble the starter from the flywheel box (1)and
use the 380000988 tool (2) to rotate the flywheel.
- Disassemble hexagon (1) shaped cap from the speed
gauge box and the pin (2) underneath.
76134
Figure 203
76136
- Verify, checking throug the hole of the box, that the
reference index of the gauge unit is displayed.
2
1
SECTION 3 − DUTY − INDUSTRIAL APPLICATION E NG I NE S
65
ED. FEBUARY 2003