EasyManuals Logo

CenterLine VeriFast MicroView 1.0 User Manual

CenterLine VeriFast MicroView 1.0
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
18
VeriFast
TM
MicroView 1.0 User Manual Version 1.9
Installation Guidelines
Important Safety Information
Please review the Safety Information section starting on page 9.
Before installation procedure for the MicroView is started, ensure that all
services (e.g., power, air, water) provided to the devices connected to
MicroView are de-energized and locked out.
CenterLine recommends that qualified electrical personnel be involved with the setup and
operation of the MicroView. Also, a qualified weld engineer or quality control personnel should be
available for tolerances adjustments and scaling, when required.
Mounting the MicroView Unit
Using four M4 screws through the mounting holes on the unit’s back plate, mount the MicroView
on a flat surface in a convenient location on machinery or fixture.
Installation Precaution for Field Block Applications
Prior to connecting a MicroView to a field block, it is recommended to disconnect power on the
field block. After the MicroView connections to the field block have been made, it is safe to
reconnect power to the field block.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CenterLine VeriFast MicroView 1.0 and is the answer not in the manual?

CenterLine VeriFast MicroView 1.0 Specifications

General IconGeneral
BrandCenterLine
ModelVeriFast MicroView 1.0
CategoryController
LanguageEnglish