BP Unit SiEBE18-526
356 Removal Procedure
2.2 Removal of Solenoid Valve Coil
Procedure Warning Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure Points
1. Removing the PCB. Preparations
Take the steps for removing the
PCB.
Press the fixture between your
fingers to unhook.
1
Remove the legged
TYRAP fixture from the
wire harness.
2
Remove the four
screws off the electrical
box mounting plate. Lift
the plate up to detach it.
3
Remove the four
screws off the bottom
plate.
(Q0509)
(Q0510)
(Q0511)