3 • Operation and Maintenance
Doc. 031851-05 12/04 3-3
3.4 Preparing Samples
3.4.1 Collecting and Storing
Collect samples in high density polyethylene containers that have been
thoroughly cleaned with deionized (DI) water. Do not clean containers
Do not pressurize the eluent reservoir above 70 kPa (10 psi).
Ne mettez jamais les réservoirs d'éluants sous une pression
supérieure à 0,07 MPa (10 lb/po²).
Setzen Sie den Eluentbehälter auf keinen Fall einem Druck über
0,07 MPa (10 psi) aus.
Figure 3-1. Reservoir Connections
Eluent Gas Line
Eluent Bottle
Regen In
Regen Bottle
Out Line
Out Line
Line
Gas Inlet Line