EasyManua.ls Logo

Dionex ICS-90 - B Installation

Dionex ICS-90
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc. 031851-05 12/04 B-1
B Installation
This chapter provides instructions for the initial installation of the ICS-90 Ion
Chromatography System.
NOTE These installation instructions are also shipped with the
ICS-90 as a printed manual (Document No. 031856).
B.1 Facility Requirements
Make sure the ICS-90 installation site meets the power and environmental
specifications listed in Appendix A.
The ICS-90 requires a sturdy workbench of a height that ensures convenient
access to the interior.
Allow at least 15 cm (6 in) behind the ICS-90 for power connections and
ventilation. For optimal performance, install the ICS-90 in a draft-free
location, out of the path of air conditioning and heating vents.
A clean gas source regulated to between 0.55 and 0.83 MPa (80 and 120 psi)
is required for pressurization of the eluent reservoir.
Use ASTM filtered, Type I (18-megohm) deionized water when preparing
eluent and regenerant.

Table of Contents

Other manuals for Dionex ICS-90

Related product manuals