EasyManua.ls Logo

Dionex ICS-90 - Page 65

Dionex ICS-90
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5•Service
Doc. 031851-05 12/04 5-7
10. Allow the conductivity to stabilize for 5 to 10 minutes.
11. Click the
Calibrate Slope command button under conductivity cell.
The cell is calibrated and a new cell calibration constant is uploaded
to Chromeleon. The new value is stored as the current cell calibration
constant.
After calibration, the conductivity reading should be 147.00 ±
2
µS/cm. If this is not the case, call Dionex for assistance.
12. Flush the KCl solution from the system by pumping DI water through
the cell. When the conductivity drops to near zero, stop the pump
flow.
13. Reconnect the pump to the injection valve and reconnect the line
from the suppressor to the cell inlet.

Table of Contents

Other manuals for Dionex ICS-90

Related product manuals