EasyManua.ls Logo

Distek Evolution 6100 - Installation Checkout; RPM Control; Test Duration

Default Icon
116 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Installation
Operation Manual: Evolution Series
2
-
15
Figure 2-10: Drive Unit (Rear View)
1. Calibration Probe Port 2. Holder with Probe
Installation Checkout
Your instrument has been tested thoroughly before shipment. To detect any
problems caused by shipping and handling, Distek recommends a careful check of
all crucial operating parameters after complete installation of the dissolution
system.
RPM Control
Check and record RPM display accuracy at 50, 100, 150 and 250 RPM using a
calibrated tachometer such as Distek RPMChek.
Test Duration
Check and record timing accuracy at test RPM using a calibrated stopwatch. Test
should be run over a range of expected usage. For example, if test durations and
sample times range from 15 minutes to 12 hours, testing should measure intervals
of 10 minutes, 1 hour, and 24 hours.

Table of Contents

Related product manuals