Troubleshooting
126
10099206-AA
Master/Slave
Warning Possible Cause Corrective Action
2451 No Connection To Slave 1 The network connection to Slave 1 cannot be
established or has been lost
Check network settings and physical
network
2452 No Connection To Slave 2 The network connection to Slave 2 cannot be
established or has been lost
Check network settings and physical
network
2453 No Connection To Slave 3 The network connection to Slave 3 cannot be
established or has been lost
Check network settings and physical
network
2454 No Connection To Slave 4 The network connection to Slave 4 cannot be
established or has been lost
Check network settings and physical
network
2455 No Connection To Slave 5 The network connection to Slave 5 cannot be
established or has been lost
Check network settings and physical
network
2456 No Connection To Slave 6 The network connection to Slave 6 cannot be
established or has been lost
Check network settings and physical
network
2457 No Connection To Slave 7 The network connection to Slave 7 cannot be
established or has been lost
Check network settings and physical
network
2461 Job is Different to Slave 1 The job selected in the master SmartDate
is different to the job selected on Slave 1
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2462 Job is Different to Slave 2 The job selected in the master SmartDate
is different to the job selected on Slave 2
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2463 Job is Different to Slave 3 The job selected in the master SmartDate
is different to the job selected on Slave 3
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2464 Job is Different to Slave 4 The job selected in the master SmartDate
is different to the job selected on Slave 4
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2465 Job is Different to Slave 5 The job selected in the master SmartDate
is different to the job selected on Slave 5
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2466 Job is Different to Slave 6 The job selected in the master SmartDate
is different to the job selected on Slave 6
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2467 Job is Different to Slave 7 The job selected in the master SmartDate
is different to the job selected on Slave 7
SmartDate
Conrm ‘Synchronized Start/Stop’ setting
is ‘on’, reselect the job on the Master
SmartDate
2471 State is Different to Slave 1 The producing state is different between the
Master and Slave 1 printer
Check the slave SmartDate is operational
without faults
2472 State is Different to Slave 2 The producing state is different between the
Master and Slave 2 printer
Check the slave SmartDate is operational
without faults
2473 State is Different to Slave3 The producing state is different between the
Master and Slave 3 printer
Check the slave SmartDate is operational
without faults
2474 State is Different to Slave 4 The producing state is different between the
Master and Slave 4 printer
Check the slave SmartDate is operational
without faults
2475 State is Different to Slave 5 The producing state is different between the
Master and Slave 5 printer
Check the slave SmartDate is operational
without faults
2476 State is Different to Slave 6 The producing state is different between the
Master and Slave 6 printer
Check the slave SmartDate is operational
without faults