36
After sterilisation, check the hand grip for mechanical
integrity.
Do not use damaged hand grips.
9. SAFETY INSPECTIONS
Check the power supply cable for damage and
replace if necessary.
Check for distortions and cracks in the plastic parts.
Check the load-bearing system for distortion or damage.
Check for loose parts.
9.1 SETTING THE SPRING FORCE
The ideal spring force is set in the factory.
Polaris 50 Ceiling / Polaris 50 Wall
The luminaire head must be installed before the
spring force is adjusted.
Move the spring-balanced arm to the highest possible
position.
Insert a 6 mm Allen wrench through the opening on the
middle joint and adjust the spring force by turning the
spring.
Turn the screw clockwise (+) to increase the spring force
(if the spring-balanced arm lowers).
Turn the screws anticlockwise (-) to reduce the spring
force (if the spring-balanced arm rises).
Damage to the hand grip
Do not sterilise with hot air
Wrap the hand grip in a sterile bag before sterilisation.
The hand grip is designed exclusively for damp
sterilisation with pre-vacuum and saturated steam
fractioned 3 times with the following parameters:
Risk of death from electric shock.
Unplug from the grid
The power supply cable must be checked at least
once a year for damage.
Maintenance and repairs should only be performed
by qualified electricians.
The corresponding user profile is in Chapter 2, Safety
instructions.