3. Machine Setup and Installation
3.1 Transportation
The equipment is delivered in transport units. Each transport is loaded onto a wooden pallet and
secured by polyester strapping.
The machine must be secured on a pallet for transportation. A forklift (or other lifting device) is
necessary for lifting the machine to the pallet. The casters must be fit nicely in the recess on the pallet
for proper packaging. Secure the machine to the pallet with plastic strapping across the top plates with
a layer of cardboard on it to avoid damage. Cover the machine with sturdy box for protection and hold
the whole box to the pallet with plastic strapping.
The machine can be removed from the pallet using forklift truck or other lifting device.
DO NOT CARRY MACHINE BY HAVING THE FORKLIFT FORKS UNDER
THE ARCH! ONLY PLACE FORKS UNDER THE MACHINE FRAME.