6.9 Checking
Before attempting to reassemble the machine 3 checks should be made:
1) The rotor should be turned by hand to ensure that it turns freely
without anything touching.
2) All of the bolts should be recheck ed to ensure that they are tightened
correctly.
3) It is recommended that the bolts are tightened regularly.
6.10 Closing the upper part with hopper
When opening/closing the machine absolutely nobody, but the op-
erator must be in or near the upper part, rotor housing and movable
parts.
Clean all closing parts of the upper and under part of the rotor housing be-
fore closing the machine.
1) Remove the lock pins.
2) Turn on the hydraulic pump by tu rning the start/stop button on the
control panel.
3) Close the hopper and the upper part of the housing by operating the
hydraulic valve lever on the side of the Rasper.
4) When the hopper and the upper part have moved to its limit, turn off
the hydraulic pump.
5) The 4 retaining bolts on top of the Rasper are put in place and
tightened with a 46-mm spanner. It is ve ry important that the upper
part is 100% tightened against the rotor housing as the machine
may otherwise be damaged.
6) The 2 eyebolts are placed in the mounting again and are tightened.
Mount the dust pipe
7) Connect the safety switch.